Column Spacing: 50’ X 40’
. Clear Height: 24’ Minimum. Sprinkler System: .30/GPM/3,000 SF. Offi ce: 4,000 SF. Dock loading: 19-10’x10’ dock high doors. Drive-in door: 1- 10’x10’ ramp doors. Truck court: 120’ (60’ concrete, 60’ heavy duty asphalt). Trailer parking: may be added. Car parking: 130 spaces. Floor slab: 6” reinforced concrete slab